Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: A problem that needs to be fixed |
Tags: | a8m, bridge, closure, m8a8, notbuilt, path |
Date time: | 2.46pm, Saturday 8th April, 2017 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The replacement path under the new A8(M) bridge does not look like being a priority for Transport Scotland. The only path under Scotland's shortest motorway!
Comments reflect the views of the original submitter only.