Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: A problem that needs to be fixed |
Tags: | a89, crossing, dualcarriageway, m8a8, split, toucan, underconstruction |
Date time: | 2.50pm, Saturday 8th April, 2017 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Despite the footway of the A89 not allowing cycling, and despite this crossing leading to nothing but a bus stop that does not have any bus services carrying bikes, a toucan crossing has been installed across Coatbridge Road. Does this come from the cycling budget and is it counted in the claimed mileage of cycleways for the M8 motorway project?
There is a wider view at #89019.
Comments reflect the views of the original submitter only.