Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | junction, kelvin, kelvincycleway, kelvinwalkway, path, sharp |
Date time: | 4.23pm, Friday 9th June, 2017 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
An unnecessarily sharp turn at the junction of the Kelvin Walkway and the path to Southmuir Place. This could potentially be a main route into North Kelvinside and the West End from the Kelvin Walkway.
No addition to the signpost to reflect the new route available, and still lots of slippery muck on the main path, hazardous when passing other path users, or when turning at junction.
Comments reflect the views of the original submitter only.