Add to Gallery: | Add this photo to a Gallery |
Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | flood, kelvin, kelvincycleway, kelvinwalkway, new, path, ponding, ruined, surface, washout |
Date time: | 4.30pm, Friday 9th June, 2017 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
It's hard to believe that this path is only a few weeks old.
Unlike the other rebuilt paths linking to and from the Kelvin Walkway, this riverside path was not asphalted, but instead has been given a loose surface. Unsurprisingly, it is already wrecked after the first heavy rain since it was built. What a waste!
If this path was built properly it woud attract dog-walkers and others away from the main Kelvin Walkway path, thus reducing congestion.
Comments reflect the views of the original submitter only.