Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | graffiti, junction, kelvin, kelvincycleway, kelvinwalkway, mud, path, sign |
Date time: | 4.33pm, Friday 9th June, 2017 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
As welcome as the rebuilt paths connecting to the Kelvin Walkway are, some have brought thier own problems, including here mud washing down onto the main path. There were problems here before, but now worse than ever!
The sign covered in graffiti directs cyclists up a flight of steps to Maryhill Road and station.
Comments reflect the views of the original submitter only.