Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | a74, bollards, broomhouse, buildout, carparking, cyclelane, doorzone, nib, paint |
Date time: | 3.00pm, Saturday 3rd June, 2017 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The Broomhouse cycle lane goes over a flattened build-out, then becomes a painted door-zone cycle lane.
Comments reflect the views of the original submitter only.