Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: A problem that needs to be fixed |
Tags: | buildingworks, connect2, cyclistsdismount, twitterimport, wcw |
Date time: | 2.56pm, Sunday 1st October, 2017 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/justacwab/status/914489292596146177 |
Credit: | Just Another Cyclist [Twitter username: 'justacwab'] |
Area: | Glasgow |
West City Way, Glasgow. Flagship cycling infrastructure. Dismount and use pavement. Pathetic. t.co/wU0gexsvJZ
[See also #93831]
Comments reflect the views of the original submitter only.