Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bollards, droppedkerb, hybrid, ncn7, ncn75, steppedcycletrack |
Date time: | 9.45am, Sunday 3rd December, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Dropped kerbs have been installed at the access to the Village development (rectifying #71113), but that footway next to the stepped cycleway is so narrow!
Comments reflect the views of the original submitter only.