Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | corduroy, crossing, incorrect, ncn7, ncn75, steppedcycletrack, tactiles, underconstruction |
Date time: | 9.47am, Sunday 3rd December, 2017 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The plans show a parallel cycle/zebra crossing to go in here.
Incorrect corduroy tactiles have been used.
Comments reflect the views of the original submitter only.