Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | branches, footway, rebuilt, shareduse, underconstruction |
Date time: | 9.49am, Sunday 3rd December, 2017 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The northern footway of Govan Road being rebuilt for shared use, with some low branches coming over the wall from the park.
Comments reflect the views of the original submitter only.