Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: An example of good practice |
Tags: | closure, glasgow-cumbernauld, redevelopment, sighthill, sign, temporary |
Date time: | 3.44pm, Sunday 1st April, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Protected signs on path closed for Sighthill's redevelopment (the original Glasgow-Cumbernauld cycle route), and a reopened path to Baird Street.
Comments reflect the views of the original submitter only.