Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | newbuild, path, redevelopment, sighthill |
Date time: | 3.44pm, Sunday 1st April, 2018 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Reinstated access (possibly temporary) between the Springburn Expressway footbridge and Pinkston Drive, during the Sighthill redevelopment. Old and new buildings can be seen to the left.
UPDATE 2020: The path is now shut - see #112923.
Comments reflect the views of the original submitter only.