Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: A problem that needs to be fixed |
Tags: | bollards, crossing, cyclecrossing, ncn7, ncn75, parallel, raisedcrossing, shareduse, underconstruction, zebra |
Date time: | 9.49am, Sunday 1st April, 2018 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new zebra and cycle parallel crossing on Govan Road still hasn't been completed. Not even the shared footway surface has been finished!
Comments reflect the views of the original submitter only.