Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Other (infrastructure-related) |
Tags: | closure, construction, entrance, ncn756, park, selloff |
Date time: | 2.31pm, Saturday 21st April, 2018 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The entrance to Richmond Park now doubles as the construction site entrance. NCN756 is unuseable since there is no way through to the riverside other than the steps next to Rutherglen Bridge (see #95375).
Comments reflect the views of the original submitter only.