Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | alignment, corner, crossing, fastlink, footway, ncn7, ncn75, pacificdrive, shareduse, toucan |
Date time: | 9.53am, Sunday 6th May, 2018 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Could the route alignment be any worse? How about a cycle crossing straight across to the new path (see #93791) at the Village development rather than the split toucan?
Comments reflect the views of the original submitter only.