Category: | Cycleway: Other (infrastructure-related) |
Tags: | bollards, crossing, cyclecrossing, ncn7, ncn75, parallel, raisedcrossing, shareduse, zebra |
Date time: | 1.56pm, Tuesday 22nd May, 2018 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The parallel cycle and zebra crossing has now been finished. Go left to turn right. It's also not clear what is and what is not shared use footway.
Comments reflect the views of the original submitter only.