Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | damage, lochlomondpath, ncn7, surface, treeroot, underpass |
Date time: | 2.43pm, Tuesday 22nd May, 2018 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Tree root damage to NCN 7 cycle path in Partick. See also #173694.
Comments reflect the views of the original submitter only.