You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.
The visitor bike parking at the Kelvingrove Art Gallery is full of hire bikes, so this visitor has locked to a lamppost near the entrance.
Temporary cycle parking on the grass verge at the Riverside Museum while the regular cycle parking is out of bounds due to construction work.
The last of the Nextbike bolt-down stands has succumbed to the inevitable, and now there are only the visitor parking stands left at the Kelvingrove Art Gallery.
The Maryhill Road crossing on North Woodside Road has now been completed. Corduroy tactile paving has again been used erroneously in place of the wider gap Cycleway type. Left and right turns have been banned with the Ahead Only sign.
With only one original cycle hire parking stand remaining, the hire bikes are taking over the visitor cycle parking at the Kelvingrove Art Gallery. See update at #185039.
The communal bike pump seen in #90787 is now missing parts, in addition to being unusable in this location surrounded by stands, and should be removed.
All but two of the original Nextbike hire stands at the Kelvingrove Art Gallery have been removed, and the fixings on those remaining are partly pulled out, so hire bikes are being left on the visitor cycle parking stands, causing … [more]
Cycle parking stand relocated during works at Glasgow Science Centre, but mostly full of hire bikes.
The tie-in between the bottom of the new ramp down from the Forth and Clyde Canal to Garscube Road is poor. A kerb blocks the entrance to the ramp from Firhill Road and a ramp has been provided facing Firhill Road but this appears to be for … [more]
The new ramp from Firhill Road and Garscube Road up to the Forth & Clyde Canal and the bridge to the Claypits nature reserve is now open. In addition to the ramp, there are steps available for pedestrians. Part of the Nextbike hire station … [more]
A Nextbike docking station at Keppochhill Road, with the St Rollox Drive cycle track in the background.
A cycle hire station in Pollokshields on Maxwell Drive/St Andrew's Drive, and a painted footway cycle lane leading to a toucan crossing to the right.
A new Nextbike station on Maryland Drive, Craigton, and a driver parked on double yellow lines across the entrance to the cycle track on Paisley Road West.
A new Nextbike hire station on Corkerhill Road, near the Nethercraigs sports centre, a broken bollard, a bus stop in the cycle lane, roadworks vehicles parked in the cycle lane (the roadworks themselves were on part of the footway), and a … [more]
Cycle symbols have appeared at the entrance to the pedestrian precinct in Cambridge Street, apparently in contradiction to the 'No Vehicles' signs. Sauchiehall Street is a Core Path (which permits cycling), but Cambridge Street is not. … [more]
The southern entrance to Partick station is becoming a bit cluttered, and is being used for car parking, including over the path, which is also partially blocked by hire bikes.
The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf
The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. http://www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf
The plastic ramp hasn't stayed in place, but the sandbags are better than nothing for bumping down the kerb. An asphalt ramp added on top of the road surface would be better. [Sorted in update at #144431]
With the dropped kerb on the right, the cycle track connecting North Woodside Road to Hopehill Road/Maryhill Road junction is blocked by the hire bike. Weaving around the hire bike thus becomes necessary, when having the dropped kerb in the … [more]
A Nextbike bike hire station on the corner of Firhill Road and Garscube Road, with stands for ordinary and electric hire bikes.
Electric bike hire stands at North Woodside Road. This area will be rearranged as part of the Connecting Woodside project, but at the moment any ebikes placed in the stands (as in #113230) would be obstructing the footway, and due to the … [more]
Great to see loads of people (myself included!) getting home after @TRNSMTfest with a @nextbikeUK . https://t.co/n9EPzCxi7e
The new double decker cycle parking at Partick station now starting to become quite popular, after all the disruption due to the bus station rebuilding project.
New double decker cycle parking at Partick Interchange. Work is still ongoing rebuilding the bus station.
The cycle track linking Albert Road and Victoria Road has been blocked by a cycle hire station. Hopefully this will be sorted during the South City Way work.
Cycle parking at the Glasgow Science Centre and cinema. Damaged racks in the open, shop wheel stands in a shelter, and a Nextbike hire station.
A sign for the West City Way at Kelvingrove Art Galleries, with no further explanation. In the background, someone unlocking a hire bike.
The St Enoch Square bike hire terminal, next to the Howard Street contraflow lane, which still has a car parking problem.
Temporary hire bike and bike parking stands in Tunnel Street, for Commonwealth Games, since regular stands at SECC are within the security cordon.
Glasgow getting ready for the Commonwealth games.@Glasgow2014 @GetReadyGlasgow http://t.co/Y8jAYQqe6Z
Quickest way from argyle street to bridge street? #thinkbike :) @nextbike @nextbikeUK http://t.co/eJQzVhDcXi See also #59497
Quickest way from argyle street to bridge street? #thinkbike :) @nextbike @nextbikeUK http://t.co/eJQzVhDcXi See also #59498
Glasgow's new rent a bike scheme is a great addition to the city. #peoplemakeglasgow http://t.co/7lGGxCalma
Is Glasgow introducing a bike scheme? If so, great news! :) #getactive #livewell @exerciseworks @FraserAHP @GlasgowCC http://t.co/2YJYSJgeZC
infrastructure for Glasgow's bike hire @nextbikeuk scheme gradually appearing! Great news! http://t.co/O2fpZM1Wuk