The section of canal towpath between the Murano Street bridge and Shakespeare Street (see #192196) remains closed for resurfacing.
The canal towpath is now closed for resurfacing. Work can be seen going on in the distance. However, the only information for the diversion route is on the notice at the closure. The route itself, which is via the parallel main road, is not … [more]
Active travel routes into and around Sighthill still closed. This is the path between Craighall Road and Sighthill, alongside the motorway.
Active travel routes into and around Sighthill still closed. This is at Port Dundas Basin. Opened 2023, see #192415.
The footway and crossings between Garscube Road and Cowcaddens, across and along Phoenix Road, have been shut as part of the M8 motorway viaduct repair work.
I was surprised at how flimsy this barrier was, compared to all the others. Maybe there's a wall of steel barrier further on.
The path into the park is closed for works, but the diversion appears to be signed into the worksite! I used another route instead.
The Garscadden Way and path to the Drumchapel Way is presently blocked by Scottish Water works, but the path to Annan Drive has been kept open. Conon Avenue has now reopened.
The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf
The Govan Nextbike station has been closed due to persistent vandalism. SPT had been proposing allowing the facility to be relocated across the road to Govan Bus Station. http://www.spt.co.uk/documents/latest/rtp230617_agenda13.pdf
The covered walkway at the SECC is temporarily closed, due to the use of the building as a temporary hospital.
The road to the replacement bridge at Bogside Road has not been completed yet. This will lead to #112836.
The road up to the replacement bridge has not been completed yet. Once it is finished, it is to be restricted to prevent through motor traffic from using it. This will lead to #112863.
The path linking the South Bank path and Oatlands is presently shut while work is underway on rebuilding the Polmadie Bridge.
Rogerfield Road appears to have been commandeered for the motorway widening project. Another loss for active travel. Does Core Path status actually mean anything?
Apparently Polmadie Bridge was found to be in such a perilous state that it had to be shut immediately, including closing the paths and river beneath it! Demolition is due to start on 12 October 2015. No replacement bridge has been proposed … [more]
After objections, the Fastlink busway carriageway over the Clyde Arc bridge will now permit cycling. But the plastic barriers at each end will only be removed once the buses are due to start running.
Notice saying no access to cycle parking from 6AM on 16th November, but not saying how long for. Notice still in place two weeks later.
"Cycle Route SUSPENDED" for Commonwealth Games Always a good idea to give some sort of diversion signage (see #59999)