Construction of the rebuilt modal filter at North Woodside Road is nearly complete. The road and pedestrian traffic signals have been brought into use, but the cycle signals are still bagged up.

The temporary segregation at the south end of Kelvin Way has temporarily been removed for COP26, and although the fences have now been removed from around the Kelvingrove Art Gallery, the segregation has not yet been replaced. The 'Road Clo ... [more]

Only one usable gap remains in the closure of Kelvin Way for cycling through. This makes it difficult to turn into Kelvin Way from University Avenue.

Temporary signage to "No Entry"!

The Old Dumbarton Road cycleway is not finished, but it is open, and the COP26 diversion is now active.

The Ferry Road dropped kerb (see #175002) did not stay clear for long. Again, materials dumped partly obstructing users of this dropped kerb.

The Benalder Street cycleway has now been connected to the Old Dumbarton Road cycleway, with the installation of the raised crossing. The old lamppost seen in #174295 has been removed.

The Old Dumbarton Road cycleway has now been cleared of obstructions at the Ferry Road junction. The raised crossing has been installed and awaits lining. Some bollards might be in order too.

Old Dumbarton Road closed for installing the raised crossing at the Bunhouse Road junction.

Work on the path through Yorkhill Park appears to have ceased.

The new layout in Cambridge Street. A two-way cycle track has been provided between the underpass from Dundasvale Road to the Renfrew Street junction. The cycle track ends at the Renfrew Street junction at a low-level cycle traffic signa ... [more]

@GetGlesgaMoving @GlasgowCC @GoBikeGlasgow @policescotland Hope McDonald's being charged lane rental??! @CBTransport Where is alternative bus stop situated?? If there's room for a dedicated lane for Macdonald's drive thru, there's room fo ... [more]

The bus stop on Lancefield Quay, at the popup cycle lane, is still in use so there is a gap in the cones, and as soon as I turned around to take a picture of the end of the popup cycle lane, someone was trying to park a car there, in the wa ... [more]

Although the popup cycle lane has been marked for westbound use only, there is quite a bit of use eastbound, particularly here where the parallel NCN75 Clyde Walkway has been shut due to a building fire.

The popup cycle lane at Lancefield Quay has "No Entry" markings on it, but the parallel NCN75 Clyde Walkway (visible to the right) is closed due to a building fire.

The council has stated that the popup cycle lane is for westbound use only, but this section in particular at Lancefield Quay is seeing significant wrong direction use, since the only other alternative to the closed Clyde Walkway is to cycl ... [more]

The recommencement of the popup cycle lane at Lancefield Quay, where the parallel NCN75 riverside cycle path is shut due to a building fire.

I guess the road markings are to remind bus drivers turning onto the Fastlink busway to look out for cyclists, but they appear to suggest to cyclists to go straight on, when the yellow sign says to use the busway.

The popup cycle lane recommences in Broomielaw, after George V Bridge, while NCN75 U-turns down a ramp onto the riverside path. The footway along this section ahead is no longer shared-use, but still sees people cycling along it, even with ... [more]

The popup cycle lane continues onto Broomielaw, passing under the Central Station bridge.

The popup cycle lane in Clyde Street.

The Clyde Street popup cycle lane, and a closed layby.

The recommencement of the popup cycle lane in Clyde Street, after Victoria Bridge.

A traffic lane removed on Clyde Street and turned into a popup cycle lane.

The popup cycle lane in Clyde Street, to provide extra capacity for NCN75 on the shared footway.

The plastic ramp hasn't stayed in place, but the sandbags are better than nothing for bumping down the kerb. An asphalt ramp added on top of the road surface would be better. [Sorted in update at #144431]

Start of temporary cycle lane on Clyde Street. People joining from either the carriageway through the cones, or from the ramp from the shared footway.

This is more like it! 😊 shame it starts as randomly as it stops - how about more of this @GlasgowCC and some permanent barriers? Encourage healthy transport! 😁🚴‍♀️ https://t.co/4J5XNGvche

Cycling home with Flora along Pollokshaws Road. Traffic management for the shared path resurfacing better cycle provision than path itself! Buy hey, 6 lanes for motors obviously essential https://t.co/Whhbubr5SC

Work in progress on Wallacewell Road.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/cones/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.