Donate using PayPal

Tags: construction

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

Work blocking the South City Way cycle track on Pollokshaws Road, and also showing the general layout at toucan crossings along the route.

Work progressing on the new bridge across the Forth & Clyde Canal at Stockingfield Junction.

Fountainwell Road is presently closed in Sighthill, so St Rollox Drive is temporarily not a through road. The road on the right has been opened, and is presently the sole road access to the residential area of Sighthill.

The path between Craighall Road and Pinkston Road is now closed for construction work. This path leads to #165573.

The path alongside the motorway, between Pinkston Road and Craighall Road, has been closed. In the original publicity material it was stated that "constant access" would be maintained along this path, although given the nature of the work t ... [more]

The Forth & Clyde Canal towpath is now shut at Stockingfield Junction for construction of a new bridge. Signed diversions have been put in place. In the opposite direction, the closure is at Ruchill Street. On the opposite bank, the path ... [more]

Messy obstructed cycleway on Douglas Street, with a totally inappropriate surface. Just like the one on Waterloo Street to the left (see #95475 and #95476).

The entrance to Richmond Park now doubles as the construction site entrance. NCN756 is unuseable since there is no way through to the riverside other than the steps next to Rutherglen Bridge (see #95375).

Looking through the compound gate, a new road has been built through what was Richmond Park. I don't suppose that row of trees on the right is staying much longer.

Give way to construction traffic in Richmond Park.

NCN756 blocked off at Richmond Park, part of which has been sold off for a housing development. The path to the left leads to a flight of steps.

The path beyond the fence in #95371 has already been built, but isn't being maintained since it is within a construction site.

The path into Richmond Park doesn't actually connect to the main part of the path at the moment due to further house building.

The crossing of Bunhouse Road is a mess, and is currently partially blocked by hoarding. In the background a van driver has blocked the cycleway with his van, right next to some car parking spaces on the road, and near a large car park j ... [more]

A path undergoing reconstruction, with installation of lighting, in Cardonald Park.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/construction/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.