Faulty counter not counting.

The Garscube Road cycleway approaching its end at Firhill Road. Across the road, motor vehicle parking has been formalised outside the shops and businesses.

Cycleway gritted ✅

One thing that is quite disappointing on the Garscube Rd project is the minor junction design, what is going on with these bell mouths, no sharp kerb / ramp up from either direction - really promotes fast driving without taking due care. … [more]

What looks like a new type of cycle counter on Garscube Road. I didn't wait to find out.

Just what I needed, matey sleeping in the cycle lane on Garscube Road https://t.co/jhW5lhrWNe

Cars being parked on the footway of Garscube Road, rather than in the place indicated by a single yellow line on the road. Not helped by a waiting peak restrictions sign being next to the double yellow lines.

The tie-in between the bottom of the new ramp down from the Forth and Clyde Canal to Garscube Road is poor. A kerb blocks the entrance to the ramp from Firhill Road and a ramp has been provided facing Firhill Road but this appears to be for … [more]

A van driver has decided to block the footway and partly block the cycleway on Garscube Road, causing a pedestrian to have to walk around the van in the cycleway. A family group cycling towards the camera are not seen due to being hidden by … [more]

The start of the Garscube Road cycleway, seen coming from the Queens Cross direction. Next time I'll try going between the first and second bollards rather than the second and third which was quite tight.

The end of the Garscube Road cycleway, but there is a short length of cycleway to the left in Hinshaw Street. Construction is underway to the right, of a new ramp for access to the Forth & Clyde Canal. See update at #171178.

The Garscube Road cycle track at the entrance to the Oakbank Trading Estate. There is a flashing LED cycle sign, but this one didn't light up, unlike one further south.

One day I'll come along here and it will be open. There's a continuous cycle track around the corner into Possil Road which continues as far as Baird's Brae. A short connection has been built in St George's Road, which will later be … [more]

The Garscube Road cycleway still unopened at Possil Road. See update at #171177.

Still surfacing work outstanding at the south end of the Garscube Road cycle track.

The Garscube Road cycle track is nearing completion, but some of the tactile paving is the wrong colour for non-signalised crossings.

The southern end of the Garscube Road cycle track still hasn't been completed, but is at least now rideable. Top surface is all that is required. Further north, the path is complete up until Sawmillfield Street, with work in progress at the … [more]

Finishing work still required at the southern end of the Garscube Road protected cycle lane. It will connecting into the underpass and other existing cycle infrastructure through Cowcaddens.

Progress on the Garscube Road cycle lane.

The Garscube Road cycle track taking shape, at the Corn Street junction.

The connection from the underpass to the new cycle track on Garscube Road.

The Garscube Road cycle track starting to come together at its southern end.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/garscuberoad/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.