Donate using PayPal

Tags: hybrid

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

Contractors still using the cycle lane for their temporary signs.

A slight adverse camber on the shiny smooth asphalt cycle track.

Corduroy tactiles were specified in the drawings and corduroy tactiles were duly installed, rather than cycleway tactiles.

The surface on the cycleway is the same shiny smooth asphalt used on the footway. Not good for grip.

Dropped kerbs have been installed at the access to the Village development (rectifying #71113), but that footway next to the stepped cycleway is so narrow!

Bus lane cameras. Will there be cycle lane cameras? A stepped two-way cycle track is being built along part of Govan Road, but the footway has been reduced to a minimal width, resulting in people walking on the cycle track. An extra metr ... [more]

Bridge joints in the new stepped cycle lane on George V Bridge have still to be finished.

If you are going straight on from George V Bridge, the new stepped cycle lane is no use (see #82971), so must continue to use the carriageway, in lane 3. But there's a 20mph sign, so that makes it all right!

The stepped cycle lane on George V Bridge is for left turns only. Anyone going straight on should remain on the carriageway, in lane 3 or 4 (see #82973). Plenty of footway clutter to deal with on the corner.

New stepped cycleway on George V bridge. Far too narrow. Motorists passing far too close. Hellish. https://t.co/C2DajJpBYr

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/hybrid/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.