Donate using PayPal

Tags: naturereserve

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

It may not be finished, but a dropped kerb at Panmure Gate would be nice. The path now leads to the Claypit Local Nature Reserve.

Cycle parking, steps and a ramp at the new Panure Gate entrance to the Claypits Local Nature Reserve. The boardwalk leads along the side of the canal and connects to the new bridge at #153304.

The new bridge across the canal at the Claypits Local Nature Reserve is now open.

The new bridge to the Claypits nature reserve nearing completion.

Claypits Nature Reserve bridge under construction over the Forth & Clyde Canal. There is a rough path to get around the side of the worksite.

Claypits Nature Reserve bridge under construction over the Forth & Clyde Canal.

A new bridge taking shape in the Claypits nature reserve.

The finishing touches remain to be done at the new path into the Clay Pit local nature reserve.

A new path at the Clay Pit local nature reserve.

New paths at the Clay Pit local nature reserve. The surface is gravel so not so good for cycling, but was frozen solid with frost when I visited.

A new path into the Clay Pit local nature reserve.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/naturereserve/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.