Donate using PayPal

Tags: railway

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

While the Nithsdale Road railway bridge is being rebuilt, the Strathbungo footbridge in Moray Place has been made accessible, in advance of its permanent replacement. The work involves timber ramps at each side, leading to a step-free … [more]

The odd narrow footway arrangement under the Castlebank Street railway bridge approaching NCN7. There is a dropped kerb to join the path immediately after the bridge (see #173856), while the rest of the road is just a dead-end alongside … [more]

Roadworks continue on Ferry Road. The surface on the footway is still incomplete. Updated at #175001 and #175002.

The junction where it is proposed to close NCN7 during the COP26 conference and divert users around the streets of Yorkhill, Finnieston and Anderston. The carriageway of the road is accessed via the dropped kerb before the bridge, and the … [more]

A former railway bridge in Carmichael Street that Highways England has proposed for filling in. This one is probably no loss since the area either side has been developed and the railway cutting filled in.

A bridge over the railway line next to Cartcraigs Road. Network Rail has applied to demolish this bridge without replacement as part of the project to upgrade and electrify the railway through here. See … [more]

Ashfield Street bridge over former railway alignment, one of several bridges proposed for infilling by Highways England that now has responsibility for the former British Railways Board (Residual) portfolio of disused railway lines and … [more]

Refurbished bridge, seen previously in #87513. The area has been tidied up, although graffiti has returned. Unmade paths lead through the woods to Cadder.

The popup cycle lane continues onto Broomielaw, passing under the Central Station bridge.

Sustainable drainage provides space for roadworks signs! Beyond the sign, there's another of those mysterious ramps as in #112831.

The entrance to the Robroyston station car park on the Millerston side. A 'Cyclists Dismount' sign but nothing to say motorists can't drive all the way to their parking spaces.

Egress from the Robroyston station car park on the Millerston side is via the bus turning circle.

Cycle parking at Robroyston rail station. There is cycle parking on both sides of the line.

Robroyston station car park, Millerston side, including cycle parking.

A general view of the Millerston side car park at the new Robroyston rail station, seen from the station footbridge.

A general view from the Robroyston station footbridge looking northwest towards the M80 motorway junction. The two roundabouts on the meandering station access road can be seen before the massive roundabout at the motorway junction itself.

A general view of the car park and road layout at Robroyston station, looking north, seen from the station footbridge. The road access on this side is somewhat indirect.

Cycle parking at Robroyston rail station. There is cycle parking on both sides of the line.

A 'Cyclists Dismount' sign, unusually in mixed upper and lower case, at the entrance to Robroyston station car park, suggesting the footway from #112818 is indeed shared-use. For those not on the footway, a mandatory tour of the car park … [more]

The entrance to Robroyston railway station.

According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. … [more]

According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. … [more]

The new double decker cycle parking at Partick station now starting to become quite popular, after all the disruption due to the bus station rebuilding project.

New double decker cycle parking at Partick Interchange. Work is still ongoing rebuilding the bus station.

When this area at Partick station was repaved, I thought it might be getting prepared for the installation of the large double decker bike racks, given the congestion on the existing cycle parking. But no, it has been getting used for car … [more]

The new bridge over the railway line at Bredisholm Road is not finished.

Not many empty spaces on the cycle parking at Glasgow Queen Street railway station

Clyde Cycle Path (old railway) Location: Yoker, Clydebank (Scotland, United Kingdom)

Loch Lomond Cycle Path in Scotstoun, Glasgow (NCN 7 and former railway line)

Loch Lomond Cycle Path going under Dyke Road, Yoker, Glasgow (NCN 7) UPDATE: This bridge will be reconstructed in July 2012 and a new underpass formed in its place

Anniesland station cycle parking, which has since been joined by some sheltered parking.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/railway/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.