You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.
Building work continues at Clyde Place. The cycle track approaching the Tradeston Bridge has been rebuilt. However, the position of the temporary railing directed me onto the new kerb which I wasn't expecting.
According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. … [more]
According to Network Rail, the railway bridge on Muirhead Road has been "rebuilt stronger and wider to enable two-way traffic, cycle route and pedestrian footpath". I don't see a cycle route. … [more]
The surface on the ramp between Broomielaw and the Clyde Walkway has been reinstated. A sign proclaims "access improvements". Ah, it's slightly wider (see #88473).
The northern footway of Govan Road being rebuilt for shared use, with some low branches coming over the wall from the park.
Newly rebuilt path linking Kelvingrove Park and Kelvinbridge, part of NCN 756 Kelvin Cycleway, at point where path goes from riverbank to under a former railway bridge. On the right is a former railway tunnel mouth, making this quite a … [more]