Donate using PayPal

Tags: steppedcycletrack

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

Transition between segregated paths and shared footway, with incorrect corduroy tactile paving.

Access to the Village retail hub has been closed off, perhaps temporarily.

Craigiehall Street meets Govan Road, but no dropped kerb for access to the NCN7 cycle path.

Contractors still using the cycle lane for their temporary signs.

The plans show a parallel cycle/zebra crossing to go in here. Incorrect corduroy tactiles have been used.

A slight adverse camber on the shiny smooth asphalt cycle track.

Corduroy tactiles were specified in the drawings and corduroy tactiles were duly installed, rather than cycleway tactiles.

The surface on the cycleway is the same shiny smooth asphalt used on the footway. Not good for grip.

Dropped kerbs have been installed at the access to the Village development (rectifying #71113), but that footway next to the stepped cycleway is so narrow!

Bus lane cameras. Will there be cycle lane cameras? A stepped two-way cycle track is being built along part of Govan Road, but the footway has been reduced to a minimal width, resulting in people walking on the cycle track. An extra metre … [more]

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/steppedcycletrack/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.