Donate using PayPal

Tags: workinprogress

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.

The section of canal towpath between the Murano Street bridge and Shakespeare Street (see #192196) remains closed for resurfacing.

The latest on the Sighthill Bridge construction site.

I don't think the replacement Sighthill Bridge will be opening in "the early months of 2022". https://www.glasgow.gov.uk/index.aspx?articleid=27331

Slippery cobbles being installed on Dalsholm Bridge.

Installation work on a protected cycle lane in Royston Road. Alterations appear to have been made.

Traffic signals being installed on Lochburn Road at the canal bridge. Low-level cycle signals have been included for cyclists going along Lochburn Road. [Now they are operational, the low-level signals give cyclists a head-start of a few … [more]

Light segregation installed on the Colleges Route cycle lanes in Clarence Drive. The transition between road and bus boarder is rough. The parking bay up ahead has been located outside of the cycle lane.

Light segregation being installed on the Colleges Route cycle lanes in Clarence Drive.

A dropped kerb is to be added for access to the toucan crossing. Surely something that should have been done when this layout was originally built.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://glasgow.cyclestreets.net/photomap/tags/workinprogress/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.