You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within Glasgow.
Go to the national CycleStreets photo listings for photos beyond.
The section of canal towpath between the Murano Street bridge and Shakespeare Street (see #192196) remains closed for resurfacing.
I don't think the replacement Sighthill Bridge will be opening in "the early months of 2022". https://www.glasgow.gov.uk/index.aspx?articleid=27331
Traffic signals being installed on Lochburn Road at the canal bridge. Low-level cycle signals have been included for cyclists going along Lochburn Road. [Now they are operational, the low-level signals give cyclists a head-start of a few … [more]
Light segregation installed on the Colleges Route cycle lanes in Clarence Drive. The transition between road and bus boarder is rough. The parking bay up ahead has been located outside of the cycle lane.