The canal towpath is now closed for resurfacing. Work can be seen going on in the distance. However, the only information for the diversion route is on the notice at the closure. The route itself, which is via the parallel main road, is not … [more]
NCN756 closed in North Claremont Street, with a partly obscured sign saying to dismount and use footway. But there is no footway on this side of the road, and the road itself is one-way the opposite way. The 'diversion' sign lying on the … [more]
NCN756 closed in North Claremont Street, with a sign saying to dismount and use footway. But there's no footway on this side and pedestrians are walking in the road.
There used to be a path forking right here, from the Kelvin Walkway into Wyndford, but now there's a new fence, so it looks like the path won't be returning once the long-term water works are finished.
While the Nithsdale Road railway bridge is being rebuilt, the Strathbungo footbridge in Moray Place has been made accessible, in advance of its permanent replacement. The work involves timber ramps at each side, leading to a step-free … [more]
The footway and crossings between Garscube Road and Cowcaddens, across and along Phoenix Road, have been shut as part of the M8 motorway viaduct repair work.
A large area has been taken for a works compound for the M8 motorway viaduct repair work. But the path between the Garscube Road footbridge and Braid Square is still open.
The Old Dumbarton Road cycleway still awaits completion of utility works before it can be completed itself.
The Old Dumbarton Road cycleway is still awaiting completion of utility works before it can be completed itself.
A temporary closure of NCN75 Clyde Walkway starts tomorrow, for 7 months, as far as the Smart Bridge. Yet again, the steep ramp at the Rutherglen Bridge access point here (see #98398 and #71262), will be showing how useful replacing it … [more]
Temporary closure of the path east of the Phoenix Road underpass for work on the crumbling motorway flyover. The Colleges Cycle Route is not affected at this stage.
The Sauchiehall Street cycleway is still closed for a short distance near Dalhousie Street. See also #172679.
Cycle parking stand relocated during works at Glasgow Science Centre, but mostly full of hire bikes.
Sauchiehall Street cycleway closed for works. No obvious attempt to sign a diversion route. See also #173268.
Access between Drumchapel and Bearsden has been maintained during the long-term water works. The surface of the temporary path is stones and not good for cycling on. However, the path south (to the right) has been closed since it goes … [more]
The Garscadden Way and path to the Drumchapel Way is presently blocked by Scottish Water works, but the path to Annan Drive has been kept open. Conon Avenue has now reopened.
The resurfaced section of the Forth & Clyde Canal towpath will tie into the work at Stockingfield Junction, where a bridge is being built across the canal.
Excellent signage at the Scottish Water work on the Kelvin Walkway Garriochmill Road access, where a short path has been laid to divert around the worksite.
Excellent signage at the Scottish Water work on the Garriochmill Road access to the Kelvin Walkway. A short path has been laid around the back of the work compound to maintain pedestrian and cycle access.
This fencing has been obstructing the access to the Sighthill motorway foot and cycle bridge for some time, even though the bridge is for now still open. The fencing appears to be being used to create nothing more than a contractor's … [more]
Aaaand once again @GlasgowCC have allowed the shared path from Pollokshaws to Silverburn beside Barrhead Road to be blocked by works. @PersimmonHomes do you realise this route is for cyclists too and that many bikes are a lot wider than … [more]
Temporary northbound closure of the North Hanover Street contraflow bus lane in connection with building works at Queen Street station. The official diversion is via North Frederick Street.
A blind corner risk on the new Summertown Road shared footway. Note that the position of the dropped kerb discourages cycling away from the wall and towards the kerbline where there is better visibility.
Building works at Partick Bus Station have meant that the point where cyclists join Merkland St carriageway has now been closed, and cyclists are forced to share a narrow footway already obstructed by (unrelated) scaffolding. However, … [more]
Building work has now started at Partick Bus Station, resulting in railings being put across the point where it was easy to join the roadway in Merkland Street (see also #94587). Work is to last 9 months. … [more]
Rogerfield Road appears to have been commandeered for the motorway widening project. Another loss for active travel. Does Core Path status actually mean anything?